+ Reply to Thread
Results 1 to 1 of 1

Hybrid View

  1. #1
    Join Date
    Feb 2010

    Default Basement Shower Remodel Question

    Hi all,

    I'm going to remodel my basement shower. The shower was done only about 10 years ago, but it was done wrong. I have water leaking out of the bottom of the shower and it's corroding the studs.

    I plan on pulling up the floor and one row of the 6"x8" wall tiles. I will then lay a new preslope, liner and mud bed. I have two questions...

    1) The drain pipe is as old as the house and thats about 60 years. I'm 99% sure this is a cast iron pipe. Do you think this drain pipe needs replacing? If so, would I need to jackhammer the sub floor to get to it and have a plumber come in a attach a PVC drain? Is this even possible?

    2) The shower has one wall that is solid concrete (it's a basement). This wall has two layers of tile on it (the original tile and the tile set 10 years ago). How will I attach the new shower liner to this concrete wall? Can I just lay the liner up against the concrete wall and attach some durock on top of it? Then tile?

    Thank you in advance.
    Last edited by mdsnj; 02-22-2010 at 09:35 PM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts