I have a 1910 2 story building. It has 2x12x23 floor joists. They run the entire 23ft. and rest in pockets in brick walls on either side. I will be cutting a new well perpendicular to the joists. I will triple the headers and build a wall from the floor to help support the upper floor.

Anyone have any experience in the same situation? any tips?
Thanks in advance