In our 1976 house, we want to tile the floor of the shower. The underlayment is concrete. The shower is slightly belowground as the house is a raised ranch style. The concrete in the existing shower has a crack in it. Can I repair the crack before tiling, or do I need to install another base over the concrete before I tile it?