I am drywalling a room of my house orinially prepped for plaster with ~7/8 inch between the studs and existing door and window jams. Should I use 1/2 inch drywall and make up the space difference with trim pieces, or add 3/8 inch plywood or drywall shims to the studs before putting up the drywall, or something else all together?