I am putting a small(12x20) 2 story addition on my house. I had a contractor state he was going to use the trench that was dug for the footer as the form for the footer. I have a permit, and he is going to use rebar. I was just wondering if this is common or should I look elsewhere for a contractor. I'm in Ohio if that matters.