I'm replacing the tin ceiling in my kitchen and will be putting up a plywood base for nailing. I'm also removing the old dryrock which was underneath the old tin because it had some moisture damage (upstairs bathroom-fixed) and had been poorly installed. Will the plywood sub-ceiling be sufficient or do I need to put up new dryrock, too?