I live in SW Florida and I am remodeling a master bath. Two of the walls are on an outside wall which are cement block construction. My question is where is the best place for moiture barrier, on the block or before installing drywall or cement board of which I will be doing both because I will be installing a shower in one corner of the room?
Thanks,