I am finishing a second floor room. Our builder partially finished the room with electrical, ductwork and insulation. I am having some condensation issues on cold days ever since I opened the paper insulation. I closed up the paper insulation and the problem seemed to stop. I am now drywalling the room and noticed some condensation in the same areas on cold days. I suspect that some warm air from the room is mixing with cold air in the attic causing the condensation. Should I be worried that I will continue to have condensation issues after I finish drywalling the room. Should I add more insulation in the attic above that room to help with the problem?

Please help with any answers that someone has.