Is there any downside to building a low wood deck over a 12x20 slab of thick, uneven concrete, with the deck footings embedded in the ground straddling the outside edges of the slab, and the height of the deck just clearing the highest part of the slab? The necessary manpower and logistics of breaking up and hauling away the concrete is prohibitive.