+ Reply to Thread
Results 1 to 4 of 4

Threaded View

  1. #1
    Join Date
    Jan 2012

    Default Transition corner from tile to sheetrock

    I am towards the end of adding a bathroom to my basement and I am struggling with how to finish the corners where the shower travertine tile and the sheet rock meet. Part of my challenge is I have already installed the tile and sheetrock and did not plan the final details of how I was going to finish the corner.

    Any suggestions on how to finish the corner?

    the tile and the sheetrock meet on a corner. Currently the sheetrock meets the backer board for the tile and the tile meets the back of the sheetrock ... so I don't really have a corner. I tried to make a diagram of the situation below.

    OOl_ (notched out void in corner)
    OOOl (tile)

    (the "O"s are the interior of the wall)
    Last edited by branon2; 01-08-2012 at 05:57 PM. Reason: diagram didn't work

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts