Hey, I got a house from the late 50s. In the bathroom, the builder cut two sets of 3" holes between each stud in the sheathing (1 high, and 1 low). I was wondering why this was done. The sheathing is rotten and I am replacing it. Do I need to put these holes back in? Should I take any other measure to solidify this bathroom while the walls are down? Thanks!