To all who have been there, done that, I need your help for how you installed your base cabinets over the existing baseboard heat. I am currently remodeling my kitchen and one outside wall has the heat running the entire wall where new base cabinets will be installed along with a dishwasher & range. Where the heating pipe enters the kitchen is through the floor from basement & runs through an adjacent wall into the next room. I understand most people cut the new base units out to fit over the heat pipes, but how do you get the dishwash & range to push against the wall with the piping out about 3" from the wall. Basement accessability is not an option as there is a finished room below kitchen and ceiling is not removeable. Ideas/suggestions welcome.